Starting identifier- this has three components, which will auto-fill from looking at all the datums in the project. The number will increment to the subsequent number (after the last found number). On first load, the number will populate with 1.
- Prefix (optional)
- Number- this is required to be a number in order to start placing.
- Suffix (optional)
additional options:
- Tag on Placement- tag datums after they are placed (note: Tags will not generate until after the datums are finished being placed). See Datum Settings to set tag type used.